Install Estimate
Welcome to mhinstall.com. If you continue to browse and use this website you are agreeing to comply with and be bound by the following terms and conditions of use, which together with our privacy policy govern relationship with you in relation to this website.
Double-Wide Parkhome in Tampa Bay
Installer
License
IH 1234502
Invoice No.
abc123
Created
Jan 7, 2026
Last Modified
Jan 15, 2026
Estimate Total
$25,464
Lot Preparation
$20,714
Clearing and grubbing
Remove trees, roots and grass within the lot pad.
$11,615
Erosion and runoff control
Install erosion and runoff control; 3 ft. x 100+ ft. silt temporary fencing required by most locales.
$1,499
Tree protection fencing
Some locales require temporary fencing around existing trees on the lot to ensure protection from construction equipment.
$7,600
Lot Preparation
$20,714
Lot pad
Pad material
Material used to create the base that the home foundation resides on. Options: crushed concrete (recommended); 50/50 sand mix.
$1,960
Amount
The amount of material required for lot pad.
$500
Spread
Spread and compact material with crest to drain water.
$1,460
Pad material
$1,960
Home setup
$700
Permit
Attain permit from local authority for home setup and utility connections.
$500
Position home on lot
A home position is approved by a mobile park board or local authority/permitting office.
$200
Block piers
Cinder block piers with ABS footer pads or concrete footers. Pier spacing for new homes is provided by the manufacturer. Pier spacing for used homes without a pier spacing diagram provided by the manufacturer of the home follows Rule 15C-1 of the Florida Administrative Code (FAC).
–
Longitudinal and lateral stabilization
Longitudinal tie-downs resist horizontal wind loads at the end wall of a home. Lateral tie-downs prevent horizontal sliding of a home from wind loads at the side wall of a home.
–
Hurricane anchors
Hurricane anchors at 4'(feet) separation on the exterior; anchors along marriage line.
–
Vapor barrier
6 mil polyethylene vapor barrier above lot pad material.
–
Close up siding
Install siding at the front and back of home.
–
Home setup
$700
Utilities
Plumbing
Supply and wastewater connections
$2,090
Relocate wastewater connector
Reposition or replace wastewater connector to main sewer line.
$800
Relocate supply water connector
Reposition or replace connector to main water supply pipe.
$1,250
Connect supply water
Connect supply water under home to supply water line.
$40
Connect wastewater
Connect wastewater plumbing dropouts under home to main wastewater line.
–
Plumbing
$2,090
Electrical
Relocate electrical pedestal
Relocate the position of the electrical pedestal.
–
Connect subpanel to pedestal
Connect electrical panel (also referred as the subpanel) inside home to electrical panel outside of the home.
–
HVAC
Exterior unit pad
Relocate the position of the electrical pedestal.
–
Connect exterior HVAC unit to interior
The HVAC system can be a split system with multiple interior zones; a combined exterior unit; or an interior air handler system with an exterior air conditioner or heat pump unit.
–
Air handler
The air handler unit can be installed as a separate unit within an air handler closet inside the home or as part of a packaged air handler/condenser unit external to a home.
–
Condenser unit
the outdoor portion of an air conditioner or heat pump.
–
Skirting
Options: vinyl siding; bricks.
Permit
Some cities or counties require a permit for skirting.
–
Materials
Materials include pressure-treated (PT) lumber, fasteners (bolts, screws and nails), brackets.
–
Construction
The labor required to construct exterior stairs.
–
Exterior stairs
In most cases, two exterior stairs are required for a home.
Permit
Some cities or counties require a permit for skirting.
–
Materials
Materials include pressure-treated (PT) lumber, fasteners (bolts, screws and nails), brackets.
–
Construction
The labor required to construct exterior stairs.
–
Additions
Shed
A shed connected to the side of the home or free-standing.
–
Carport
A carport connected to the side of the home that contains a host beam (i.e. ledger board).
–
Driveway extension
If a driveway exists, a mobile park or local authority/permit office needs to approve of a driveway extension length, width or both.
–